[ccpw id="5"]

HomeMiningPatriot Battery on track for feasibility study in Q3

Patriot Battery on track for feasibility study in Q3

-

The winter 2025 program is expected to run through mid-April, targeting a minimum of 15,000 metres of drilling using four rigs.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

LATEST POSTS

US Gold improves CK project economics, targets feasibility by year-end

The goal is to commence construction of the now-permitted CK project as soon as late 2025.

Ecuador’s mining future uncertain as socialist gains traction

Luisa González, a protégé of ex-President Rafael Correa, is capitalizing on public frustration with the economy and gang violence.

Kodal kicks off production at Mali’s Bougouni lithium mine

First production of spodumene concentrate at Bougouni makes it Mali's second lithium mine to begin operations in less than two months.

Kodal kicks off production at Mali’s Bougouni lithium mine

First production of spodumene concentrate at Bougouni makes it Mali's second lithium mine to begin operations in less than two months.

Most Popular

spot_img