[ccpw id="5"]

HomeMiningPatriot Battery on track for feasibility study in Q3

Patriot Battery on track for feasibility study in Q3

-

The winter 2025 program is expected to run through mid-April, targeting a minimum of 15,000 metres of drilling using four rigs.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

LATEST POSTS

Kodal kicks off production at Mali’s Bougouni lithium mine

First production of spodumene concentrate at Bougouni makes it Mali's second lithium mine to begin operations in less than two months.

Patriot Battery on track for feasibility study in Q3

The winter 2025 program is expected to run through mid-April, targeting a minimum of 15,000 metres of drilling using four rigs.

Patriot Battery on track for feasibility study in Q3

The winter 2025 program is expected to run through mid-April, targeting a minimum of 15,000 metres of drilling using four rigs.

Patriot Battery on track for feasibility study in Q3

The winter 2025 program is expected to run through mid-April, targeting a minimum of 15,000 metres of drilling using four rigs.

Most Popular

spot_img